AQUATHERMENERGY
Bridge power · UK · North East & North West first

Power now.
Grid later.

Your grid date is not your expansion date. We put a containerised power plant on your site and sell you electricity per kWh until the network catches up, so the trucks, the contract and the order book run on your timetable.

18–36 months

to build a new depot grid connection, if you're lucky. Many sites are being told the 2030s.

0.5–10 MW

the size of site we serve. Too small for the big rental firms, too big for a battery alone.

3 yrs +

typical term, with a grid-arrival break. You're renting time, not buying a power station.

Who it's for

Businesses with a date on the wall.

Nobody pays for bridge power because they like it. They pay when a year without power costs more than the premium. If you can't say what goes wrong in 2028 without the power, wait for the grid. If you can, talk to us.

Depots electrifying fleets

Electric HGVs ordered or arriving, chargers grant-funded, and the DNO saying years. Trucks parked for want of power are dead capital.

Contract-driven operators

Won or bidding for work that requires zero-emission vehicles from a start date. Automotive, supermarkets, Scope 3. Miss the date, lose the contract.

24-hour sites that can't expand

Cold stores and process plants with an order book and no headroom at the substation. Every year of delay is a year of return gone.

Sites already on diesel gensets

No premium at all. You're swapping a worse bridge for a better one: cheaper per kWh, cleaner, and contracted.

How it works

One counterparty. Kit, fuel and price.

01

Qualify

A 20-minute call. Your demand, what the network has offered and when, what fuel is on site, and what each year of waiting costs you.

02

Design & price

Containerised gas engine plus battery, sized to your load. Gas on site if you have it, tanker fuel if not. A two-part price: capacity per month, energy per kWh linked to gas.

03

Permits & funding

We handle the gas connection, G99, permits and planning, and bring the funder. You sign one power contract and own nothing downstream of the meter you don't already own.

04

Power on

Months, not years. Metered at the boundary, billed monthly, availability guaranteed. When the grid arrives, you can exit on notice and the kit moves to the next site.

The deal

You're renting time, not buying a power station.

The thing that makes people hesitate is being locked into a premium after the grid turns up. So we designed that out.

Does your site qualify?

Tell us the date.

Four questions. If there's a real cost of waiting, we'll call you within two working days. If there isn't, we'll tell you to wait for the grid, and mean it.